Skip to content

The build blog

Practical guides, cost breakdowns, and expert tips for UK homeowners planning a construction project.

Builder Markup on Materials: Should You Buy Them Yourself?
Quote Analysis

Builder Markup on Materials: Should You Buy Them Yourself?

Builder markup on materials is typically 10–20% on supply and fit. Buying your own can cost more than it saves: on a 5% VAT job you lose the relief entirely.

11 Nov 20269 min readRich
Read
Insurance Cash Settlement Too Low? How to Check the Figure
Quote Analysis

Insurance Cash Settlement Too Low? How to Check the Figure

Insurers cash settle at discounted network rates, not market rates. UK home claims now average over £7,000. Reconcile the offer against your builder's quote.

21 Oct 20269 min readRich
Read
Spray Foam Removal Quotes: Fair Price or Pressure Sale?
Quote Analysis

Spray Foam Removal Quotes: Fair Price or Pressure Sale?

Spray foam removal costs about £28–£60 per m², or £2,000–£4,500 for a typical three-bed loft. Here is how to tell a fair removal quote from a pressure sale.

7 Oct 202610 min readRich
Read
Can I Cancel a Builder After Signing? The 14-Day Cooling-Off Rule
Quote Analysis

Can I Cancel a Builder After Signing? The 14-Day Cooling-Off Rule

Agreed a builder's quote at home? You can usually cancel within 14 days, or longer if they never told you. Accepted it by email after a site visit? Often not.

14 Sept 20268 min readRich
Read
Log Burner Installation Quotes: Six Lines That Decide the Price
Quote Analysis

Log Burner Installation Quotes: Six Lines That Decide the Price

Log burner installation costs £2,500–£3,500 with a usable chimney, £4,600–£7,300 without. Here are the six quote lines that explain the gap. Part J explained.

9 Sept 202610 min readRich
Read
Boiler Beyond Economical Repair? How to Check the Verdict
Quote Analysis

Boiler Beyond Economical Repair? How to Check the Verdict

Beyond economical repair is a commercial judgement, not a safety verdict. Only a Gas Safe verdict condemns a boiler. Check yours before you spend £3,000.

2 Sept 20269 min readRich
Read
A Real Builder's Quote, Annotated Line by Line (Good vs Bad)
Quote Analysis

A Real Builder's Quote, Annotated Line by Line (Good vs Bad)

What does a builder's quote actually look like, and where do the problems hide? Here is a realistic example quote annotated line by line, with the red flags a good check would flag.

15 Jun 20269 min readRich
Read
Builder Gone Bust Mid-Job? What to Do First and What You Can Recover
Quote Analysis

Builder Gone Bust Mid-Job? What to Do First and What You Can Recover

If your builder has gone bust mid-job, act fast: secure the site, stop payments, document everything, and check your recovery routes including Section 75. Here is the order to do it in.

15 Jun 20268 min readRich
Read
How to Compare Builder Quotes - The Complete Method
Quote Analysis

How to Compare Builder Quotes - The Complete Method

Line up scope, exclusions and payment terms before price. In the worked example the cheapest quote, £48,000, normalises to £55,150 once the gaps are added back.

24 Mar 20268 min readRich
Read
DIY Quote Checking vs Getting Professional Help - A Practical Guide
Quote Analysis

DIY Quote Checking vs Getting Professional Help - A Practical Guide

You can check a builder's quote yourself with the right knowledge. Here's a practical guide to DIY quote checking - and when to get professional help instead.

22 Mar 20267 min readRich
Read
How to Tell if Builder Reviews Are Real - A No-Nonsense Guide
Quote Analysis

How to Tell if Builder Reviews Are Real - A No-Nonsense Guide

Fake reviews have been unlawful in the UK since 6 April 2025. Seven signs that give one away, which platforms verify reviewers, and the checks that beat them.

22 Mar 20266 min readRich
Read
Free vs Paid Quote Checking - Is It Worth Paying For?
Quote Analysis

Free vs Paid Quote Checking - Is It Worth Paying For?

You can check a builder's quote yourself for free. Or you can pay for help. Here's what you get for free, what costs money, and where the real value lies.

20 Mar 20266 min readRich
Read
MyBuilder vs Getting Your Own Quotes - Which Gets Better Results?
Quote Analysis

MyBuilder vs Getting Your Own Quotes - Which Gets Better Results?

Should you post your job on MyBuilder or find builders yourself? Pros, cons, and costs of each approach - plus what to do once quotes arrive.

20 Mar 20266 min readRich
Read
AI Quote Checker vs Quantity Surveyor - Which Do You Actually Need?
Quote Analysis

AI Quote Checker vs Quantity Surveyor - Which Do You Actually Need?

Should you use an AI tool or hire a quantity surveyor to check your builder's quote? Honest comparison of cost, speed, accuracy, and when each makes sense.

18 Mar 20266 min readRich
Read
Should I Use Checkatrade to Find a Builder? An Honest Look
Quote Analysis

Should I Use Checkatrade to Find a Builder? An Honest Look

Checkatrade checks ID, qualifications and CCJs, not workmanship or price. What the vetting covers, what the £1,000 guarantee excludes, what is left to you.

18 Mar 20269 min readRich
Read
How to Check a Garden Room Quote: What's Included, What's Missing
Quote Analysis

How to Check a Garden Room Quote: What's Included, What's Missing

Garden room quotes are notorious for exclusions. Here's the complete checklist of what should be included and the red flags to watch for.

13 Mar 20269 min readRich
Read
VAT on Building Work: 0%, 5% or 20%? The Complete UK Guide
Quote Analysis

VAT on Building Work: 0%, 5% or 20%? The Complete UK Guide

Most building work carries 20% VAT. New builds are zero-rated, homes empty for 2+ years qualify for 5%. Builders under the £90,000 threshold charge none.

8 Mar 20268 min readRich
Read
What Is a Provisional Sum? Why It Matters in Your Builder's Quote
Quote Analysis

What Is a Provisional Sum? Why It Matters in Your Builder's Quote

A provisional sum is an estimated allowance for work that can't be priced exactly. Here's what homeowners need to know and how to avoid cost surprises.

8 Mar 20266 min readRich
Read
Builder Hasn't Started Work - When Should I Worry?
Quote Analysis

Builder Hasn't Started Work - When Should I Worry?

A 2 to 4 week gap between signing and starting is normal. Past that with no firm date, give the builder 14 days in writing, then ask for the deposit back.

3 Mar 20267 min readRich
Read
Builder Says I Don't Need Planning Permission - Can I Trust That?
Quote Analysis

Builder Says I Don't Need Planning Permission - Can I Trust That?

A lawful development certificate costs £274 and settles it in writing. When your builder is right, when a £249 prior approval applies, and who pays if not.

3 Mar 20267 min readRich
Read
My Builder Won't Give a Written Quote - Is That a Red Flag?
Quote Analysis

My Builder Won't Give a Written Quote - Is That a Red Flag?

If your builder won't put their price in writing, that's a serious red flag. Here's what a proper quote should contain and what to do next.

3 Mar 20267 min readRich
Read
How Many Quotes Should I Get for an Extension? At Least 3 - Here's Why
Quote Analysis

How Many Quotes Should I Get for an Extension? At Least 3 - Here's Why

Get at least 3 quotes for an extension, ideally 5. It's not just about price - you're checking whether each builder has understood what you actually need.

3 Mar 20267 min readRich
Read
My Builder Changed the Price After Starting - What Can I Do?
Quote Analysis

My Builder Changed the Price After Starting - What Can I Do?

A builder cannot move the price alone. Section 50 of the Consumer Rights Act 2015 makes a change to an agreed price effective only where you expressly agree it.

1 Mar 20268 min readRich
Read
My Builder Wants 50% Deposit - Is That Normal?
Quote Analysis

My Builder Wants 50% Deposit - Is That Normal?

A 50% deposit is not normal. Most builders ask for 10-15% upfront. Here's what's reasonable, when to worry, and how to protect your money.

1 Mar 20267 min readRich
Read
My Quote Doesn't Mention Building Regs - Should I Be Worried?
Quote Analysis

My Quote Doesn't Mention Building Regs - Should I Be Worried?

A quote silent on building regulations is not automatically a problem, but ask. Building control fees run £500–£1,000, and regularisation is the route back.

1 Mar 20267 min readRich
Read
Should I Pay My Builder in Cash? Why It's Riskier Than You Think
Quote Analysis

Should I Pay My Builder in Cash? Why It's Riskier Than You Think

Paying cash is legal, but you lose the paper trail and the section 75 cover a credit card gives where the job price is over £100. Pay in stages instead.

1 Mar 20267 min readRich
Read
Fixed Price vs Day Rate: Which Is Better When Hiring a Builder?
Quote Analysis

Fixed Price vs Day Rate: Which Is Better When Hiring a Builder?

Should you pay your builder a fixed price or a day rate? We break down the pros, cons, and real-world scenarios - so you pick the right approach for your project.

27 Feb 20267 min readRich
Read
7 Warning Signs Your Builder Is Overcharging (And What to Do About It)
Quote Analysis

7 Warning Signs Your Builder Is Overcharging (And What to Do About It)

The clearest signs are a quote well above regional day rates of £200–£280, a labour share above 60%, vague line items and pressure for a big deposit.

13 Feb 202610 min readRich
Read
Builder's Quote vs Estimate - What's the Difference?
Quote Analysis

Builder's Quote vs Estimate - What's the Difference?

Quotes and estimates aren't the same thing. One is legally binding, the other isn't. Here's what that means for your building project - and your wallet.

12 Feb 20267 min readRich
Read
Is My Builder's Quote Too Expensive? How to Tell
Quote Analysis

Is My Builder's Quote Too Expensive? How to Tell

How to tell if a builder's quote is fair - cost per m² benchmarks by project type, regional multipliers, and the scope traps that make cheap quotes expensive.

12 Feb 202610 min readRich
Read
What Should a Builder's Quote Include? The Full Checklist
Quote Analysis

What Should a Builder's Quote Include? The Full Checklist

Got a builder's quote but not sure if it covers everything? Here's the 15-point checklist, plus the items most builders deliberately leave out.

12 Feb 20268 min readRich
Read
How to Read a Builder's Quote (Without Getting Lost)
Quote Analysis

How to Read a Builder's Quote (Without Getting Lost)

A plain-English guide to understanding construction quotes - what each section means, red flags to watch for, and how to compare like-for-like.

3 Feb 20267 min readRich
Read

Get our free renovation budget checklist by email